The system allows you to enable / disable any existing schedule without having to permanently remove it from the configuration: in this way it is possible to enable the execution of only the selected services.
To enable / disable a schedule:


    1. Select the desired schedule in the schedule list. The system shows the data currently configured for scheduling.
    2. Select the Enable field to enable scheduling, or deselect it to disable scheduling.
    3. Choose the Edit command.



Note: the enabled schedules are preceded in the list by the symbol ΓΌ.